Studio 60 on the Sunset Strip - Season 1 Episode 5 The Long Lead Story
Trailer: Studio 60 on the Sunset Strip - Season 1 Episode 5 The Long Lead Story
Year: 2007
Country: United States of America
Studio: NBC
Director: Aaron Sorkin
Cast: Matthew Perry, Amanda Peet, Bradley Whitford, Steven Weber, D.L. Hughley, Sarah Paulson
Crew: Aaron Sorkin (Executive Producer), Thomas Schlamme (Executive Producer), W.G. Snuffy Walden (Music), T. Rafael Cimino (Story Editor)
First Air Date: Sep 18, 2006
Last Air date: Jun 28, 2007
Season: 1 Season
Episode: 22 Episode
Runtime: 42 minutes
IMDb: 7.30/10 by 122.00 users
Popularity: 6.405
Language: English

Being Mary Jane (2013)
Mary Jane Paul is a one-woman-show: a successful TV news anchor, and an entirely self-sufficient powerhouse who remains devoted to a family that...

An American in Canada (2003)
Jake Crewe is an American television news host who is forced, after beating up his station manager, to accept a job in Calgary, Alberta as the host...

Nobody's Watching (1970)
Nobody's Watching is a television program that was never aired. It originated with and was written by Scrubs creator Bill Lawrence, as well as Neil...

Less than Perfect (2002)
Claude Casey moved up in the secretarial world of television news, from temp to the anchor's desk. After her boss hires her full time, Claude...

Sports Night (1998)
The offbeat cast and crew of a sports news show deal with professional, personal, and ethical challenges while functioning in a pressure-cooker work...

The Dick Van Dyke Show (1961)
The Dick Van Dyke Show centers around the work and home life of television comedy writer Rob Petrie. The plots generally revolve around problems at...

Murphy Brown (1988)
Murphy Brown (Candice Bergen) is a recovering alcoholic who returns to the fictional newsmagazine FYI for the first time following a stay at the...

LateLine (1998)
LateLine is an American TV sitcom that ran on NBC from March 17, 1998, through March 16, 1999. Due to an abrupt cancellation, there were seven...

Fitz and Bones (1981)
Fitz and Bones is a short-lived American television series, starring Dick and Tom Smothers, that aired on NBC in 1981.

This Time with Alan Partridge (2019)
Alan is handed a career lifeline - the chance to stand in as co-host on This Time, a weekday magazine show. But can he capitalise on the opportunity?

Kingi (2015)
A Finnish parody tv show about mainstream singing contests.

Texas Rising (2015)
A chronicle of the Texas Revolution, the uprising against the tyranny of Mexican dictator Santa Anna, from the battle of the Alamo to the battle of...

Faerie Tale Theatre (1982)
A live-action children's television anthology series retelling popular fairy tales.

Inside Look: The People v. O.J. Simpson - American Crime Story (2016)
Inside the series of the same name.

Newsreaders (2013)
Newsreaders is a quarter-hour format American television comedy that lampoons the news magazine genre. The series is a spinoff of the Adult Swim show...

Mr. Sunshine (2011)
Ben Donovan is a self-involved manager of a second-rate San Diego sports arena who begins to re-evaluate his life on his 40th birthday. Working...

Billy on the Street (2011)
Comedian Billy Eichner, unfiltered and unapologetic, hits the streets of New York City to test unsuspecting strangers on their knowledge of music and...

Jack & Jill (1999)
A lighthearted romantic comedy about post-collegiate life, love and career in New York City.

Family Passions (1993)
Family Passions was the first hour long television serial produced in Canada and Germany. It was produced and distributed by Baton Broadcasting...

Sports Night (1998)
The offbeat cast and crew of a sports news show deal with professional, personal, and ethical challenges while functioning in a pressure-cooker work...

1983 (2018)
Twenty years after a devastating terrorist attack in 1983 that halted the course of Poland's liberation and the subsequent downfall of the Soviet...

Life on Mars (2008)
After a car crash, police detective Sam Tyler mysteriously finds himself transported back to 1973 and still working as a detective.

Sense and Sensibility (2008)
Marianne Dashwood wears her heart on her sleeve when she falls in love with the charming but unsuitable John Willoughby, ignoring her sister Elinor's...